Labor Grid group by Task, Date, or LaborID and with SubTotal
Reference No: 29780
Details
Support for the Labor grid to print Group by Task/Date/LaborID and with Subtotal.
The details are explained in the sample workflow given below:
Sample Workflow
Prerequisites:
Select the Configuration module.
Set the Form Setup using the attach file for Labor Print UI file.
In the General tab > select the Split Labor line by quantity check box.
Scenario:
Select the Accounts module.
Create an Order [ORD-1122].
Add the Labor [AUDIOASSIST] with 3 Qty each , as shown in Figure 1.1

Figure 1.1 ORD-1122 with Labor
Select the first 2 lines and click the Assign Dates button > the Estimated Work Time window appears > enter the Dates, as shown in Figure 1.2.

Figure 1.2 Assigning Dates for the first two Labor lines
Select the 3rd Labor line and click the Assign Dates button > the Estimated Work Time window appears > enter the Dates, as shown in Figure 1.3.

Figure 1.3 Assigning Dates for the 3rd Labor line
Click the Re-number Labor as shown in Figure 1.4.

Figure 1.4 Re-numbering the Labor
The Same date Labor will appear as 01 and 02 in the Description field, as shown in Figure 1.5 with the first two Labor lines will have same Start Date.

Figure 1.5 Same Start Date for the First two Labor line
Save the Order > Click the Print button > Select the Form , as shown in Figure 1.6.

Figure 1.6 Selecting Form for printing
Click the Print button. The output get displayed, as shown in Figure 1.7.

Figure 1.7 Print Output
In the UI file for the type labor Grid with Component Type as "7" and in the39th column, SUBTOTAL as 6.

Figure 1.8 UI file with SUBTOTAL as 6
If GROUPBY is 0 or blank then in print labor line will appear in separate lines, as shown in Figure 1.7.
If GROUPBY is 1 then same Labor ID with same Start Date will print as 1 line after re-numbering also , as shown in Figure 1.9.

Figure 1.9 Print Output with GROUPBY as 1