R2 Core

Rep_LaborTimesheetPayRollView to View the Payroll Export Details

Reference No: 29342

Details

The custom report generated using Rep_LaborTimesheetPayRollView is used to view the view the Payroll details entered from the R2 Labor. The details are explained in the sample workflow given below:

Prerequisites

  1. Login to the R2 application.

  2. Select the Maintenance module > Labor tab > click the New icon.

  3. Create the Labor Positions [CAMERAOPERATOR] and [PRODUCTIONMANAGER].

  4. Save and Exit the Maintenance module.

Sample Workflow

  1. Select the Account module. The Account window is displayed.

  2. Tag a Company [JVC].

  3. Create an Order [ORD-1028].

  4. Select the Labor tab. Click the Search Labor icon. The Search Labors window is displayed.

  5. Add the Labor Positions [CAMERAOPERATOR] and [PRODUCTIONMANAGER] with 1 Qty each as shown in Figure 1.1.

Figure 1.1 ORD-1028 with the Labor Positions [CAMERAOPERATOR] and [PRODUCTIONMANAGER]

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I1.png

 

  1. Select the Schedules tab > click the Add icon to add an Order Task, as shown in Figure 1.2.

Figure 1.2 Schedules tab with the Order Task [Rehearse]

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I2.png

 

  1. Select the Order Task [Rehearse] for each of the Labor Positions [CAMERAOPERATOR] and [PRODUCTIONMANAGER] , as shown in Figure 1.3.

Figure 1.3 Selected Tasks for each of the Labor Positions [CAMERAOPERATOR] and [PRODUCTIONMANAGER]

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I3.png

 

  1. Save and Exit the Order [ORD-1028].

  2. Login to R2 Labor application.

  3. Select Planning > search the Order [ORD-1028], as shown in Figure 1.4.

Figure 1.4 Select Planning in R2 Labor and Search the Order [ORD-1028] created in R2

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29324ExportCost_C1_I4.png

 

  1. Click the Order [ORD-1028] link. The Order [ORD-1028] Scheduling window is displayed, as shown in Figure 1.5.

  2. Click the Resource importable button shown in Figure 1.5.

Figure 1.5  Order [ORD-1028] Scheduling window

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I5.png
  1. The Resource Search window is displayed as shown in Figure 1.6.

  2. Select a Resource [Peter] which does not have any company tagged and the Resource type is a Freelancer.

Figure 1.6 Select a Resource in the Resource Search window

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I6.png

 

  1. In the Labor line, select the Unit drop-down as Hourly, as shown in Figure 1.7.

Figure 1.7 Selecting Unit as Hourly in the Labor Line

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I7.png
  1. Change the Status of the Labor line to Confirmed, as shown in Figure 1.8.

Figure 1.8 Changing Labor line Status to Confirmed

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I8.png
  1. Select the Labor Planner importable button to add a Labor Planner [MANTRA UBS] for the order, as shown in Figure 1.9.

Figure 1.9 Select the Labor Planner for the Order

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I9.png
  1. Save and Exit the Order.

  2. In the R2 Labor welcome page, select the Timesheet tab and select the Create button, as shown in Figure 1.10.

Figure 1.10 Select the Create button to Create a Timesheet

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I10.png

 

  1. The Create Timesheet window is displayed.

  2. Select the Type [Job], Enter Time By [In and Out Time], and Job Name [ORD-1028], as shown in Figure 1.11.

Figure 1.11 Details within the Timesheet

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I11.png
  1. Enter the Hours for the Production Manager, as shown in Figure 1.12.

Figure 1.12 Enter the Hours for first Labor line [Production Manager]

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I12.png
  1. Enter the Hours for the Camera Operator, as shown in Figure 1.13.

Figure 1.13 Enter the Hours for second Labor line [Camera Operator]

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I13.png
  1. Enter the Expense [10$] for both the lines, as shown in Figure 1.14.

Figure 1.14 Add Expense for the Labor lines

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I14.png
  1. Select the Save button.

  2. Select the Send for Approval button > the Request for Approval window is displayed > enter the Message [Approved] > click the Send button as shown in Figure 1.15.

Figure 1.15 Sending Timesheet for Approval

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I15.png

 

  1. In the R2 Labor welcome page, search the Order [ORD-1028], as shown in Figure 1.16.

Figure 1.16 Search the Order [ORD-1028] in Welcome page

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I16.png

 

  1. Select and open the Order [ORD-1028], as shown in Figure 1.16.

  2. The View Timesheet window is displayed with the Labor Position lines in Pending Status.

  3. Select both the Labor Position lines and select the Approve All button, as shown in Figure 1.17.

Figure 1.17 Select the Labor lines and Select the Approve All button

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I17.png
  1. The Status of the Labor lines will be modified to Approved, as shown in Figure 1.18.

Figure 1.18 Change the Status of Labor line from Pending to Approved

https://documentation.r2help.com/mergedProjects/Reports/topics/images/29342ExportCost_C1_I18.png
  1. Save and Exit the Order [ORD-1028] in the R2 Labor application.

  2. Select the Reports module and generate the Rep_LaborTimesheetPayRollView Report.

  3. The Rep_LaborTimesheetPayRollView Report displays the Approved By [MANTRA UBS], Contract ID [ORD-1028], Labor Planner [MANTRA UBS], Order Description, Position [Production Manager], [Camera Operator], [AV Technical Operator], Rate [24143], Resource ID [CONT-070], Resource Name [Peter], and Schedule Date [11-08-2017], as shown in Figure 1.19.

Figure1.19 Rep_LaborTimesheetPayRollView Report