-
Open the Order in Graphical Scheduler.
-
Right- click date header > select required Date range to display Labor Position as per EWT.
-
Click and drag the Labor Position and drop it in the Crew section for the respective crew as shown in Figure 1.0
-
The Crew is assigned to the Labor Position as shown in Figure 1.1.