Multi user Support to the Planning Order
Reference No: RR-2115
Details
Support is provided for Multi users on the Planning Order.
Illustration
Create two Planners [JRULE] and [MITH S].
The Planner [MITH S] logs in > open the Order [Order00176] > modify a line of [VIDEO ENGINEER 01] in the Order [Order00176].
Simultaneously, the other Planner [JRULE] logs in > opens the same Order [Order00176] > the line [VIDEO ENGINEER 01] appears to be locked as the Planner [MITH S] has been modifying.
Hover the cursor over the line [VIDEO ENGINEER 01]. The Figure 1.0 displays the tool tip displaying the Modified By, Modified Date and Connection fields.

Figure 1.0 Tool tip for locked lines
Click the Un-Lock to Edit button to unlock the line. The application displays an error message as shown in the Figure 1.1.

Figure 1.1 Error message
Similarly, add new Positions to the Order [Order00176] as the Planner [MITH S]. The notification appears to the other Planner [JRULE] on the same Order and on clicking Refresh button, new positions that are added are reflected.
The Planner [MITH S] having the Planning Order [Order00176] opened > same order is opened by other Planner [JRULE], the changes are reflected on the Whiteboard cells of the Order [Order00176].
When Planner [MITH S] opens the Planning Order and performs the modification and closes the browser without saving Order. And, when same Order [Order00176] is opened by the same Planner [MITH S]. The modification done earlier is retained.
When Planner [MITH S] opens the Planning Order and performs the modification and closes the browser without saving Order. Then, when same Order [Order00176] is opened by other Planner [JRULE] from Order Search, the system displays a message as shown in Figure 1.2. Selecting the Yes button, discards the changes done by Planner [MITH S] and selecting the Get Previous session Data button, changes done by Planner [MITH S] will be retained.

Figure 1.2 Message for unsaved changes