R2 Core

Support to Renumber Booking Lines Based on Labor Description

Reference No: R2-10209

Version No: 06.00.05-00

Details

The Renumbering action on the Booking line is based on Labor Description.

Sample Workflow:

Scenario: R2 Labor

  1. Select Planning Order menu > Orders > search and open Order [ORD-055] for Planning.

  2. Select Add Positions  icon from Planning header > add 3 Labor Positions [Lightning Director], as shown in Figure 1.0.

  3. Rename the Labor Positions, as shown in Figure 1.0.  2 > select Re-Number Position  icon from the Planning header. The Renumbering action retains the modified description, and selected Booking Line is renumbered as per the Assigned Dates, as shown in Figure 1.0 3

Similar action for single Booking Line is done using Re-Number Position option available in Floating tool bar.

https://documentation.r2help.com/mergedProjects/Accounts/topics/images/10209_renumbering.png
Figure 1.0 Renumbering the Booking Lines